ARKOSOM / Status
Status
Company, project and service status. Reviewed November 21, 2026.
Public availability, documented milestones and planned work are listed separately.
Active operations and released work
ARKOSOM LLC · Operational. Parent company connecting technology, commerce, logistics, independent publishing and research.
Amazon Hub Delivery · Operational. Package delivery is active. Public parcel intake, drop offs and returns acceptance are not active.
Distribiz · Operational. Online sales use the established eBay storefront. Individual listings determine availability; local retail and consignment remain planned.
Stasrift · Released. Version 1.0.1 is the latest verified public GitHub release, published October 8, 2026. It runs locally; it is not published to PyPI.
Rememberer · Public platform and published work. The author’s bibliography reports I Am the Rememberer as published in hardcover on October 4, 2026. The bibliography also includes I Am the Tomorrower: The Infinite Ark (hardcover), The Power to Disconnect (paperback) and The Noonoon Dictionary (Kindle eBook), confirmed in Amazon KDP publication notices. Publication history is separate from current availability of every edition.
Technology in development
ARKOSOM Network · In development. Architecture and prototype planning. The two node communication test is a planned milestone; no public network service is available.
ARKOSOM Hosting · In development. Foundation v0.1 has a documented milestone of 21 local tests. Live authorization, browser accessibility and independent recovery remain unverified. Public subscriptions are unavailable.
Data-Line · In development. The public site describes internal beta work. Broader distributed continuity and synchronization are not a completed public service.
Perstia · In development. Concepts and specifications; no verified product release or completed integrations are announced.
Blututh · In development. Operating and recovery environment project. No verified bootable release, installer, ISO or commercial support is available.
Research and verification
ARKOSOM documents engineering hypotheses, local prototypes and bounded verification evidence. Research concepts and planned integrations are not completed scientific findings or released services.
Planned services
Ackley storefront · Established November 17, 2026. Located at 102 17th Street, Ackley, Iowa 50601. Public opening hours, walk-in services and returns acceptance have not been announced. Amazon location approval remains separate.
Distribiz consignment · Planned. Intake is not active. Terms and procedures must be established before accepting merchandise.
Broader professional services · Planned. Digital preservation, documentation, websites, accessibility assistance and commerce support are being prepared. Scope and availability must be confirmed individually.
Restricted systems and evidence
Operator workspace · Internal beta. Restricted to approved Operators. Public registration is unavailable; this is separate from a public product release.
Local browser prototype · Public demonstration. Preserves and compares local example records. It does not implement an operating system or distributed synchronization.
Operational means an active business activity. Released means an identified public product release. In development means work is ongoing without the claimed public release. Planned means a future offering. A public website or passing local tests alone does not establish a live service or a launched beta.